Intellisolar
OTHER SOLUTIONS

PPC

One Controller for Grid-Compliant Plant Output.

The Intellisolar Power Plant Controller (PPC) sits between the grid operator and your inverters, measuring at the Point of Interconnection (POI) and coordinating every inverter so the whole plant behaves as a single, grid-code-compliant generator.

SLDC DISPATCHCMD #1041
P LIMIT70%
Q MODEV-CONTROL
IEC 60870-5-104LINK OK
FEEDBACKPOI • 132 kV
P22.27MW
Q2.04MVAr
V132.8kV
f49.994Hz
Class 0.2SPF 0.996

INTELLISOLAR PPC

POI-REFERENCED CLOSED-LOOP CONTROL
RAMPING
ACTIVE POWER TRACKINGSETPOINTACTUAL
100%80%60%AVAILABLE
P SET
21.0MW
P ACTUAL
22.3MW
Q
2.0MVAr
BESS
-1.3MW
P LIMITRAMP LIMITERQ(V) CONTROLP(f) DROOP • ARMED100 ms loop
INVERTER FLEET • 8 BLOCKSBLK-06 OFFLINE • LOAD REDISTRIBUTED
BLK-01
3.19MW
BLK-02
3.20MW
BLK-03
3.20MW
BLK-04
3.18MW
BLK-05
3.16MW
BLK-06
—
BLK-07
3.18MW
BLK-08
3.20MW
BESS62%
-1.3MW
ABSORBING
SLDC Dispatch → PPC → Inverter & BESS Setpoints → POI Feedback → Grid-Code Compliance
PLANT OUTPUT
25.52MW

Active Power at POI

POWER FACTOR
0.99PF

Reactive Power Setpoint Met

ACTIVE POWER LIMIT
85.0%

Operator Curtailment Setpoint

GRID FREQUENCY
50.01Hz

Within Grid Code Band

SYSTEM ARCHITECTURE

Plant-Level Closed-Loop Control.

The PPC closes the loop between grid operator commands, POI measurements and inverter setpoints, so the plant follows dispatch and grid-code requirements automatically.

INTELLISOLAR ARCHITECTURE
SYSTEM FLOW: ACTIVE (EXPORTING)
01DISPATCH

SLDC / GRID OPERATOR

COMMAND RECEIVED
ACTIVE POWER LIMIT
85%

Active power limits, power factor and reactive power setpoints arrive from the grid operator over SCADA.

DISPATCH • IEC 104
02CLOSED-LOOP CONTROL

POWER PLANT CONTROLLER

P • Q(V) • RAMP ACTIVE
SETPOINT ERROR
0.2%

Compares POI measurements with the targets and calculates the setpoint for every inverter.

SETPOINTS • MODBUS
03SETPOINT EXECUTION

INVERTER FLEET

SETPOINT SHARED
FLEET OUTPUT
25.5MW

All online inverters follow their share of the plant setpoint, so the plant responds as one unit.

PLANT OUTPUT 25.5 MW
04FEEDBACK & METERING

POINT OF INTERCONNECTION

PF 0.99 • 50.01 Hz
POI VOLTAGE
132.6kV

POI meters feed active power, reactive power, voltage and frequency back to the controller.

INTELLISOLAR CONNECTIVITY: SLDC commands over IEC 60870-5-104, POI metering and inverter setpoints over Modbus TCP, closing the plant control loop at the point of interconnection.
OPERATIONAL CAPABILITIES

Know What's Happening At Your Point of Interconnection.

Five continuous capabilities that keep your plant within its interconnection agreement while following operator dispatch.

01

Active Power Control

CURTAILMENT & RAMP-RATE LIMITING

02

Reactive Power & Voltage

POWER FACTOR, Q SETPOINT & Q(V) CONTROL

03

Frequency Response

P(f) DROOP & FREQUENCY SUPPORT

04

Inverter & Storage Coordination

MULTI-VENDOR FLEET CONTROL

05

Compliance & Reporting

SETPOINT TRACKING & AUDIT LOGS

Active Power Control

CURTAILMENT & RAMP-RATE LIMITING

Limit plant output to the commanded setpoint and control how fast it changes.

Operational Functions3 Key Capabilities
Follow curtailment and dispatch commands from the grid operator
Limit ramp-up and ramp-down rates to the grid-code requirement
Share the plant-level limit across inverters by available capacity
INTELLISOLAR PLATFORM DEMO

Plant Control & Grid Compliance, in One View.

Monitor POI active and reactive power, grid frequency, SLDC setpoints, controller modes and inverter dispatch in real time from one supervisory interface.

INTELLISOLAR PPC • 30 MW PLANT • POI 132 kV
LIVE 1s
Active Power at POI
P CONTROL
21.01 MW
Setpoint Met
Setpoint: 21.0 MW (70%)Error: 0.0%
Reactive Power & Voltage
Q(V) MODE
+2.04 MVAr
PF 0.995
−9.9 Lead132.6 kV+9.9 Lag
Grid Frequency
P(f) ARMED
49.994 Hz
In Deadband
49.50Droop response outside band50.50
Controller Status
CLOSED LOOP
Active power limitON
Ramp-rate limiterON
Q(V) voltage controlON
P(f) frequency droopARMED
Loop 100 msSLDC • POI • 32 INV linked
Setpoint Tracking • Today
06:00 – 18:00
Available SLDC setpoint Actual at POI
10 MW20 MW30 MW9:0012:0015:00NOW
Curtailment commands today: 2All setpoints met
SLDC Dispatch Log
IEC 104
13:30P LIMIT → 70%ACTIVE
11:00P LIMIT → 85%MET 38s
09:15Q MODE → V-CONTROLMET 2s
06:00P LIMIT → 100%MET
Timestamped for compliance reporting
Inverter Fleet Dispatch
7 / 8 BLOCKS
BLK-01
3.01
BLK-02
3.02
BLK-03
3.02
BLK-04
3.00
BLK-05
2.98
BLK-06
OFF
BLK-07
3.00
BLK-08
3.02
Setpoint shared across 7 online blocks
Active Alarms:
0 Critical • 1 Advisory (BLK-06 Comms)
cloud.intellisolar.in • Live telemetry stream active.
WHY INTELLISOLAR

Grid Compliance Without Manual Intervention.

Keep your plant compliant with the grid code and the utility's dispatch instructions while getting the most from your generation.

ACTIVE TELEMETRY
PLANT-LEVELGRID COMPLIANCECLOSED-LOOP CONTROL
OPERATIONAL CLARITY
01DISPATCH

FOLLOW GRID OPERATOR DISPATCH

Act on curtailment and setpoint commands automatically and confirm the plant has responded.

02COMPLIANCE

STAY WITHIN GRID CODE

Hold power factor, voltage support, ramp rates and frequency response within interconnection limits.

03COORDINATION

ONE PLANT, MANY INVERTERS

Coordinate multi-vendor inverters and storage so the plant responds as a single generator.

04AUDIT TRAIL

COMPLETE COMPLIANCE RECORD

Keep a timestamped record of every command and response for utilities, regulators and commissioning.

POWER PLANT CONTROLLER

Make Your Plant Behave Like One Grid-Compliant Generator.

Talk to Intellisolar about adding a Power Plant Controller to your utility-scale solar or hybrid project.